loading

WORKS SWING

  • ORTHO
  • ORTHO
  • ORTHO
  • ORTHO
  • ORTHO
  • ORTHO

The plot is located at Musashino area facing a highway in a recessed site. This project started with the plot they spent much time on finding out.

The master is working at an IT associated company and his wife is an agent of a champagne associated company. The plot is a semi-size zone sandwiched by medium-rise houses and thus we adopted a 3-stories steel structure.

The ground floor adopts a cantilever structure to hold a pilotis garage. To solve the north slant limit, the façade shapes trapezoid with openings arranged at random. As a result SWING looks toward the front street with the peculiar face. The 1st floor lays a water area and the second floor holds a kids room for the near future and an open bedroom for WIC and wardrobes. Taking the advantages of the trapezoid box, the top floor with abundant natural light lays a spacious studio for the whole family. SWING harmonizes with the slight void of the urban city with its delicate and nimble shape.

DATA

  • Location Musashino city Tokyo
    Completion 2010. 10
    Lot area 46.53㎡
    Site area 36.93㎡
    1F floor area 22.84㎡
    2F floor area 36.93㎡
    3F floor area 36.93㎡
    Total floor area 96.70㎡
    Structure Steel Structure
    Scale 3F
    Typology Private housing
    Family structure A couple (30s)
    Structure engineers Masaki Structures Institute
    Kenta Masaki
    Facility engineers Shimada Architects
    Zenei Shimada
    Construction Maekawa Construction
    Photographer Masao Nishikawa
  • 所在地 東京都武蔵野市
    竣工 2010年10月
    敷地面積 46.53㎡(14.07坪)
    建築面積 36.93㎡(11.17坪)
    1F床面積 22.84㎡(6.91坪)
    2F床面積 36.93㎡(11.17坪)
    3F床面積 36.93㎡(11.17坪)
    延床面積 96.70㎡(29.25坪)
    構造 重量鉄骨造
    規模 地上3階建
    用途 専用住宅
    家族構成 夫婦(30代)
    構造設計 正木構造研究所
    正木健太
    設備設計 シマダ設計
    島田善衛
    施工 前川建設
    建築写真 西川公朗